Bonding of Metal-CFRP with Big Heads

Are you experiencing a complex bonding process? Learn in our success story how you to simplify your workflow thanks to the visual process control. 


Customer Requirements

  • Process simplification
      - Currently primer application on both substrates is required
      - Flashing off the primer
      - Approx. 45 minutes to reach handling strength
  • Reduction of process error sources

Kisling Solution: 1675-1

Methacrylate Structural Adhesive

  • Gap filling up to 10 mm
  • Minimum adhesive layer 75 µm (spacer)
  • Colour change during curing enables visual process control
  • Low odour
  • DIN EN 45545-2 certified

Customer Benefits

  • Inline quality control: Colour change of adhesive indicates initial handling strength
  • Handling strength in less than 5min 
  • No primer required
  • Low odour - less smell in the production facility

More information

GermanEnglish
Product flyer
Focus flyer Lightweight Materials & Composites
Overview brochure

Fixture Time Indicator

We use a service of the third-party provider YouTube to embed videos. The operator of the site is Google Ireland Limited ("Google"). This service may collect data about your activities. Please read the privacy policy and agree to use this service to view this video.

Watch the video